Buying renewable electricity has not stopped the emissions of the largest cloud providers from rising. The ITU found that operational emissions at Amazon, Microsoft, Alphabet and Meta in 2024 were roughly double their 2020 levels when counted against the grids their data centres actually draw from.
- 494 TWh Worldwide, 2024: 163 digital companies reported using 494 TWh of electricity, about 1.7% of global electricity consumption. (ITU and WBA (Greening Digital Companies 2026, summary), Sep 2026)
- 269 TWh Worldwide, 2024: the 10 largest electricity users among digital companies consumed 269 TWh, more than Australia (257 TWh). (ITU and WBA (Greening Digital Companies 2026), Sep 2026)
- 192% to 239% Worldwide, 2024: operational emissions of Amazon, Microsoft, Alphabet and Meta were 192% to 239% of their 2020 levels (location-based). (ITU and WBA (Greening Digital Companies 2026, summary), Sep 2026)
- 45% Worldwide, 2024: renewable electricity made up 45% of the electricity reported by digital companies. (ITU and WBA (Greening Digital Companies 2026, summary), Sep 2026)
Headline figures
- Worldwide, 2024: only 13% of the 200 assessed companies (25 companies) reported running on 100% renewable electricity. (ITU and WBA (Greening Digital Companies 2026, summary), Sep 2026)
- Worldwide, 2024: the 200 companies reported 301 million tonnes of CO2e in Scope 1 and location-based Scope 2 emissions. (ITU and WBA (Greening Digital Companies 2026, summary), Sep 2026)
- Worldwide, 2024: market-based Scope 2 emissions were 164 million tonnes CO2e lower than location-based emissions. (ITU and WBA (Greening Digital Companies 2026, summary), Sep 2026)
- European Union, 2024: data centres consumed around 68 TWh of electricity. (European Commission (data centre package, IP/26/1667), Sep 2026)
- European Union, 2030: data centre demand is expected to reach 114 TWh, more than 3% of EU electricity demand. (European Commission (data centre package, IP/26/1667), Sep 2026)
- Great Britain, 2024: data centres used 1.8% of all electricity taken from the grid (metered). (DESNZ (data centre electricity workbook), Jun 2026)
- United Kingdom, 2025 to 2035: greenhouse gas emissions from AI compute could total 34 to 123 MtCO2. (DSIT (UK Compute Roadmap evidence annex), Apr 2026)
- Microsoft, 2024: 92 percent of its decommissioned cloud hardware was reused or recycled, against a 90% goal. (Microsoft (2026 Environmental Sustainability Report), 2026)
Data centres are a small but fast-growing share of electricity use. The European Commission expects EU data centre demand to almost double between 2024 and 2030, and in Great Britain the data centre share of grid electricity rose by almost half between 2020 and 2024.
Company figures here cover each company's whole operations, offices and networks as well as data centres, and come from the producers' own reporting. Contract-based (market-based) and grid-based (location-based) emissions are shown separately because they can move in opposite directions.
How much electricity do data centres and digital companies use?
A small but growing share of the total. The digital companies tracked by the ITU used under 2% of the world's electricity in 2024, and a handful of firms account for most of it.
- Worldwide, 2024: 167 digital companies reported 667 TWh of total energy use, including fuels such as natural gas and diesel. (ITU and WBA (Greening Digital Companies 2026, summary), Sep 2026)
- Worldwide, 2024: the 10 largest electricity users made up 54% of all electricity reported by digital companies. (ITU and WBA (Greening Digital Companies 2026, summary), Sep 2026)
- Worldwide, 2024: companies headquartered in East Asia and the Pacific used 289.3 TWh, and those in North America 189.6 TWh. (ITU and WBA (Greening Digital Companies 2026, summary), Sep 2026)
- Worldwide, 2024: IT software and services companies, the group that covers software, cloud and data centre services, used 134 TWh. (ITU and WBA (Greening Digital Companies 2026), Sep 2026)
- Amazon did not report energy or electricity data for 2024. (ITU and WBA (Greening Digital Companies 2026), Sep 2026)
The ITU figures are what companies report for all their operations, so they include offices, networks and factories as well as data centres. The EU figures for 2024 and 2030 are given by the Commission, which attributes them to the International Energy Agency.
How much of Britain's electricity goes to data centres?
Under 2% nationally, measured from meters, but far more in a few towns west of London. Estimates based on capacity come out higher than the metered figures.
- Great Britain, 2020: data centres used 1.2% of grid electricity. (DESNZ (data centre electricity workbook), Jun 2026)
- Great Britain, 2024: grid electricity consumption from all users was 249.2 TWh. (DESNZ (data centre electricity in Great Britain), Jun 2026)
- Great Britain, 2023: metered data centre consumption was 4.1 TWh, against 7.6 TWh in a National Energy System Operator estimate based on capacity. (DESNZ (data centre electricity in Great Britain), Jun 2026)
- England and Wales, 2023: the ND-NEED buildings framework, which matches meters automatically, had put data centre use at 2.6 TWh. (DESNZ (data centre electricity in Great Britain), Jun 2026)
DESNZ counts colocation, managed hosting and hyperscale data centres and leaves out company-run server rooms. Data centre use is not yet separated in the main energy statistics: in DUKES it sits inside the post and telecommunications sector. Total consumption and the local picture are on the data center page.
See also: Data center statistics
How clean is the grid that data centres draw from?
It depends on the country. Swedish and Danish grids are mostly renewable, while Ireland and France get well under half of their electricity from renewables, France because its main source, nuclear, does not count.
- European Union, 2024: renewables supplied 47.5% of gross electricity consumption, up from 37.4% in 2020. (Eurostat (renewable energy share, nrg_ind_ren), Sep 2026)
- Ireland, 2024: renewables supplied 41.3% of gross electricity consumption. (Eurostat (renewable energy share, nrg_ind_ren), Sep 2026)
- Germany, 2024: renewables supplied 54.1% of gross electricity consumption. (Eurostat (renewable energy share, nrg_ind_ren), Sep 2026)
- France, 2024: renewables supplied 31.3% of gross electricity consumption; nuclear power, the largest source, is not counted as renewable. (Eurostat (renewable energy share, nrg_ind_ren), Sep 2026)
- European Union: 70% of electricity is now generated from homegrown clean energy sources, counting nuclear. (European Commission (Electrification Action Plan, IP/26/1596), Jul 2026)
- United Kingdom, 2025: renewable sources produced 52.1% of electricity generation. (DESNZ (DUKES 2026, chapter 5), Jul 2026)
Eurostat measures renewable electricity as a share of gross electricity consumption under the Renewable Energy Directive rules, which normalise hydro and wind output for weather. The Commission's 70% figure counts nuclear and other low-carbon sources and refers to generation. The two measures cannot be compared.
Are cloud and data centre emissions falling?
Not on the grid-based measure. Emissions counted on contracts fell sharply, but emissions counted against the grids companies use rose, fastest at the four largest cloud and AI providers.
- Worldwide, 2024: operational emissions of the 200 companies rose 1.2% on the previous data cycle. (ITU and WBA (Greening Digital Companies 2026, summary), Sep 2026)
- Worldwide, 2024: Microsoft's operational emissions were 239% of 2020 levels. (ITU and WBA (Greening Digital Companies 2026), Sep 2026)
- Worldwide, 2024: Amazon's operational emissions were 221% of 2020 levels. (ITU and WBA (Greening Digital Companies 2026), Sep 2026)
- Worldwide, 2024: Meta's operational emissions were 219% of 2020 levels. (ITU and WBA (Greening Digital Companies 2026, summary), Sep 2026)
- Worldwide, 2024: operational emissions of 14 large telecommunications operators were 89% of 2020 levels. (ITU and WBA (Greening Digital Companies 2026), Sep 2026)
- Worldwide, 2020 to 2024: among 82 companies with science-based targets, market-based Scope 2 emissions fell from 79.9 to 36.3 MtCO2e while location-based emissions rose from 79.9 to 89.5 MtCO2e. (ITU and WBA (Greening Digital Companies 2026), Sep 2026)
- Worldwide, 2024: 162 companies reported 245 million tonnes CO2e of location-based Scope 2 emissions. (ITU and WBA (Greening Digital Companies 2026, summary), Sep 2026)
- Worldwide, 2024: 93 companies reported 924 million tonnes CO2e of Scope 3 emissions, from their supply chains and products. (ITU and WBA (Greening Digital Companies 2026), Sep 2026)
Operational emissions are Scope 1 plus location-based Scope 2. The ITU says it does not attribute all the growth at the four providers to AI because companies do not publish AI breakdowns.
What will AI add in the UK?
- United Kingdom, 2025 to 2035: emissions from AI compute would equal 0.9% to 3.4% of projected UK emissions. (DSIT (UK Compute Roadmap evidence annex), Apr 2026)
- Great Britain, 2030: the government plans for clean sources to produce at least 95% of generation, which would put AI compute emissions near the bottom of the range. (DSIT (UK Compute Roadmap evidence annex), Apr 2026)
These are DSIT model scenarios built on McKinsey compute demand projections. Most of the emissions come from the power stations supplying data centres and from building them.
What about waste heat, water and old servers?
Few official figures exist yet. The Commission has put a number on the heat that could be reused, and company reports give figures for water and hardware, for their own sites only.
- European Union: reusing around half of all waste heat from European data centres would equal the heating demand of 4 million households. (European Commission (data centre package, IP/26/1667), Sep 2026)
- Microsoft, FY2025: changes to cooling in its Phoenix data centres cut water usage effectiveness by 23% year on year. (Microsoft (2026 Environmental Sustainability Report), 2026)
- Microsoft, FY2025: the company replenished more than 14.2 million cubic metres of water. (Microsoft (2026 Environmental Sustainability Report), 2026)
- Microsoft, FY2025: the company matched 100% of its annual electricity use with renewable energy purchases. (Microsoft (2026 Environmental Sustainability Report), 2026)
Microsoft's figures are its own and cover its own operations. The EU rating scheme adopted in September 2026 will rate individual data centres on energy, water and waste heat reuse; its first labels are covered on the data center page.
Glossary
- TWh
- Terawatt-hour, one billion kilowatt-hours of electricity.
- Scope 1, 2 and 3
- Direct emissions from a company's own sites and vehicles (Scope 1), from the electricity it buys (Scope 2), and from its supply chain and the use of its products (Scope 3).
- Location-based and market-based
- Two ways to count Scope 2: against the average emissions of the local grid, or against the contracts and certificates the company buys.
- MtCO2e
- Million tonnes of carbon dioxide equivalent.
- Water usage effectiveness (WUE)
- Litres of water a data centre uses per kilowatt-hour of IT energy.
- ITU and WBA
- The International Telecommunication Union, the UN agency for digital technologies, and the World Benchmarking Alliance.
- DESNZ / DSIT
- The UK Department for Energy Security and Net Zero and the Department for Science, Innovation and Technology.
Methodology and sources
Figures come from the ITU and World Benchmarking Alliance report Greening Digital Companies 2026, a European Commission press release, DESNZ statistics on data centre electricity and DUKES 2026, the DSIT Compute Evidence Annex, and Microsoft's own sustainability report for Microsoft's operations only. Each figure links to the document that carries it, with the date. Company electricity and emissions cover whole companies, not data centres alone. Location-based and market-based emissions are kept apart, and projections are labelled as such. The full Commission report on the first round of EU data centre reporting, the IEA and Lawrence Berkeley National Laboratory reports, and Google's and Amazon's sustainability reports could not be downloaded, so they are not used. The page is reviewed monthly and updated when a producer releases newer data.
- DESNZ (data centre electricity in Great Britain) · Jun 2026
- DESNZ (data centre electricity workbook) · Jun 2026
- DESNZ (DUKES 2026, chapter 5) · Jul 2026
- DSIT (UK Compute Roadmap evidence annex) · Apr 2026
- European Commission (data centre package, IP/26/1667) · Sep 2026
- European Commission (Electrification Action Plan, IP/26/1596) · Jul 2026
- Eurostat (renewable energy share, nrg_ind_ren) · Sep 2026
- ITU and WBA (Greening Digital Companies 2026, summary) · Sep 2026
- ITU and WBA (Greening Digital Companies 2026) · Sep 2026
- Microsoft (2026 Environmental Sustainability Report) · 2026